Onur Uğur, L., & Penbe , K. (2021). Comparison of the Performance of “Unit Area Cost Method” (UACM) and “Unit Price Method” (UPM) Used in Estimating the Costs of the Reinforced Concrete Multi-Storey Housing Buildings. Proceedings of the International Conference of Contemporary Affairs in Architecture and Urbanism-ICCAUA, 4(1), 751–762. https://doi.org/10.38027/ICCAUA2021TR0033N6