Onur Uğur, L. and Penbe , K. (2021) “Comparison of the Performance of “Unit Area Cost Method” (UACM) and ‘Unit Price Method’ (UPM) Used in Estimating the Costs of the Reinforced Concrete Multi-Storey Housing Buildings”, Proceedings of the International Conference of Contemporary Affairs in Architecture and Urbanism-ICCAUA, 4(1), pp. 751–762. doi: 10.38027/ICCAUA2021TR0033N6.